Pages

Sunday, May 7, 2017

WORK PROGRAMME

ITEMS
-Preparation of equipment.
-storage facility for dismantled  accessories,
-components, and materials procurement
-process of metrological inspection,
-testing of cylinders
-hydro-testing of oil coolers and heat ex-changers
-journal bearing and other internal accessories,
-connecting rod assembling, and torque
-process of components  assembling of the engine.
consideration and recommendation of the original engine manufacturer OEM series,G3512,G399.
-Inspection of necessary accessories recommendation from OEM compliance.
-Re-installation of the engine
-Engine survey
-Engine performance test to conformity
-Inspection of leftover accessories if any
-Test run
-monitoring.

ACTIVITIES.
-Preparation for dismantling and disassembling of the engines G399 and G3512 caterpillar engine.
-Engine procedure and recommendation of the manufacturer specification.
-Enclose documentation and tooling for the dismantling and disassembling process,materials and tooling.
-Lifting device preparation,inspection and color coding.
-fabrication for positioning of structures and means of transferring plant to workshop.
-The setting will be presume for one week planning or more.


No comments:

Post a Comment