PR0JECT ACTIVITIES


ITEM 4.0                                                                   ACTIVITIES                                          Duration
                                                                                   
Process of inspection of instrument.                        - Placement of components on
pressure testing,metrology or measurement,             appropriate work benches for    
of engine cylinders,liners,hydro-testing oil                assembling the gudgeon pins
coolers, and heat ex-changers.                                     with the pistons
                                                                                   -Assembling the connecting rod to
                                                                                   crankshaft case in-conjunction with the  ---1week
                                                                                    crankshaft.
                                                                                 
                                                                                    -Assembling the journal bearings
                                                                                    -Timing the engine chain and sprocket      
 Journal bearing and other internal assembling.          - inspection of installed accessories       --2week
Connection rod assembling and torquing                       -Torquing of the crankshaft
                                                                                       connecting rod bolts and nuts
                                                                                        the end and main bearing to appropriate
                                                                                        specification 24ibs/wts      