The thesis or project was presented, and it attracted series of interest and can be useful for research information or academic/professional facts finding and researches. And there are more interesting pages that will be added in due time.
Sunday, May 28, 2017
ACTIVITIES
CONNECTING ROD AND ASSEMBLING SYSTEMS DURATION
- Torquing of crank of crankshaft.
-The connecting rod nuts and bolts. ----------1 WK
-The end main bearing to appropriate to appropriate specification (24ib/wts)
The PROCESS OF COMPONENTS ASSEMBLING OF ENGINE (G399/3512) 1 WK
-installation of top cylinders/valves
-installation of valves,tappers,rockets,springs, push-rods,
-calibration of valves,inlet/exhaust (30/45 degrees) to designer/manufacturer.
-installation of transformers,and installation of other main accessories.
-installation electric module
-installation of turbo changers,governors and other components - --- 1 WK
-Add all necessary oil and water.
RE-INSTALLATION OF ENGINE,SURVEY AND PERFORMANCE TEST
-Painting and re-installation,
-lifting equipment and tranferring media
-tightening of nuts and bolts
-perform alignment of engine,gearbox and pump .-------------------------------- 1 WK
-perform other instrumentation,electronic process installation
Test run engine
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment