CONNECTING ROD AND ASSEMBLING SYSTEMS                                       DURATION
- Torquing of crank of crankshaft.
-The connecting rod nuts and bolts.                                                                      ----------1 WK
-The end main bearing to appropriate to appropriate specification (24ib/wts)

The PROCESS OF COMPONENTS ASSEMBLING OF ENGINE (G399/3512)           1 WK
-installation of top cylinders/valves
-installation of valves,tappers,rockets,springs, push-rods,
-calibration of valves,inlet/exhaust (30/45 degrees) to designer/manufacturer.
-installation of transformers,and installation of other main accessories.
-installation electric module
-installation of turbo changers,governors and other components                           -      --- 1 WK      
-Add all necessary oil and water.

RE-INSTALLATION OF ENGINE,SURVEY AND PERFORMANCE TEST
-Painting and re-installation,
-lifting equipment and tranferring media
-tightening of nuts and bolts
-perform alignment of engine,gearbox and pump .--------------------------------                   1 WK
-perform other instrumentation,electronic process installation
Test run engine                            