The process engineering construction is very important and consideration are made in various area to fulfill the requirement of the project.It is way of an organised steps to enhance the mateial and human needs or requirements are the worksite,so it connotes observing the necessary risks that may arise in the process of the tasks and other equipment,human and transporting phenomena.Agood survey of JSA may involved the following steps.Description of the work activities,which may involved the following steps including the accompanied hazards while on mobilization for the project..
    .PERSONNEL TRANSPORTATION: traffic accident and vehicle breakdown,may require the following remedy ,drive defensively,use only serviceable vehicle.no night driving and driver to observe speed limits and transport to be supplied by the client and shall be careful for armed robbery along the ways so no stops along the way and personnels must be alert and observant.

   . ARRANGEMENT OF EQUIPMENT AND MATERIALS TO THE SITE.:May be associated with the following hazards,awkward lifting and fall of materials,road accident while driving on the road,unexpected intersection by community or robbery attack along the way.and impact on facilities and other damages.loads must be carefully secured and covered ,the driver and vehicle must be certified and the speed limits observed and personnel must be responsible for the arrangement of materials.
  .ALIGNMENT OF PUMP TO DRIVER:there might be following series of hazards,slips,trips and falls,trap hands, manual handling and personnel injury. the remedial steps might be the following ,good house keeping,watch out for tripping and hazards.ensure correct tools are used for lifting pump into position,and proper handling procedure,competent personnel should be used.

  MODIFICATION OF SUCTION AND DISCHARGE PIPEWORK:removal of main pipe work and falling load, the following hazards may apply,injury to personnel or damaged to equipment in and around the working area, personal and damaged to equipment.certified slings and shackled to be supplied by the company and all other lifting equipment by client,all lifting and slinging to be carried out by the company and client representative in accordance with the company lifting plan..

 .COLLISION WITH OTHER EQUIPMENT:May involved lifting equipment,damage to equipment,personal injury,slip and fall,of material,damaged to existing facility. and the following steps shall formed the remedial steps involved :plan lift and route. check all certificates and test date of all equipment,secure materials properly,Ensure personnels are aware of task when lifting pipe work into position.use correct tools for tasked performed. and apply proper handling procedure..