PROJECT RESPONSIBILITY

There are series of work that are usually performed in any project site, though not minding the classification but the programmes define the interval in which it may fall.At  present the assumption  is pump installation or reconstruction of the process loops,for instance the discharge and the suction lines modification.The mechanical Engineer responsibility may includes the following steps: i. preparation of the materials,
ii.Revision of the implementation and follow up of the modified drawings, which may includes the following details:a. Establishing and execution of modification schedule and sequence b.Control of modification documentation and drawings.
                 c, Overall site safety management.
                 d Ensure proper quality assurance QC and QA and the safety plans.
                 e. Provide as  built drawings,
Equipment and tool list that will be required in the sequence of the task and execution of various plans may involved such as stated below:
Hydrotest pump.
Air compressor
Pressure guage of various range, 0 -100 (bar), 0-150 (bar),0-250(bar) or may be calibrated in Metric range to suite the site requirement.
Vibration analyser
Lincoln welding machine
Oxy-acetylene rack and gas cylinders
Welding torch
Travelling block 10-25(tons)
Crane of about 25(tons)
Dye penetrant equipment
X-Ray equipment
Mechanical toolbox
Portable grinder
Measurement and inspection instrument,dial gauges,magnetic stand
Vernier caliper,micrometer gauges,steel rule,measuring tape .
Power drilling machines
Classified lifting belt
Battery drilling machine
Rotalign instrument

WORK SUPERVISION AND WORK PERMIT ORGANIZATION.
The permit to work shall be raise based on the client project work program and recommendation ,which may also conform with their schedules in the project work program. The phases with the accompanied project nodes and precedence diagram will define the work scope of activities on hourly interval and the required man hour. In some organization work permit is always prepared within 48 hours. And is one of the mandatory requirement and a certificate for the work execution and commencement.
A supervisory department shall also be informed of the project specification and the period of commencement of the activity. The necessary personal protective equipment shall  also be a mandatory requirement and shall conform to standard specification of the company or client.
On commencement of the activity pre job safety meeting and tool-box shall be conducted at the site on timely interval.The contractor first aid box shall always be available throughout the operation including the first aider .The company shall educate the contractor of the necessary steps involved in any safety alarm and other methods of tag-in and tag-out systems which will enable successful sequence in the project construction and execution. A supervisor shall be attached to the contractor to ascertain that the project is adequately supervised to conformity.The client work permit rule for validation and audit shall be applied at the site when necessary and as an intricate requirement to conformation.All the personnels on the job shall ensure good house keeping and after the job, and all the generated waste shall also be evacuated in conformity with the client management procedures and policy. No other job that will impact on the contractor will be done during the activity interval. The facility manager will approve all the necessary each work permit before the work will commence on each day.

  