FINDINGS IN SEQUENCE OF OIL PRODUCTION SURVEY.

i) The two major wellhead facilities are the Cameron and Gray Tree which is mounted on the surface of the well annulus, for conduction of oil/gas production to the surface reservoir.They consist of interrelated valves for control/conducting of the hydro-carbon to the surface reservoir.
ii) The companies hook-up systems are not of the same design and construction.
iii)The hydrotesting of vessels are performed by some specialist companies.