ENGINEERING PROJECT MATERIALS AND STATISTICS.: INSPECTION /OVERHAUL PROCEDURE FOR ENGINE/COMPRESSOR/PUMP. CONTINUE;

Engineering materials are selected based on the nature of task being performed ,so in a preventive activity,the following measures may be very necessary:
-The tooling required and the nature of activity being performed.
-Equipment inspection may be defined to the scope of work.
-The procedure that is required must be clearly stated.
-Stages of task defined in a clear and simple document
-A work permit needs to be signed in accordance to what work that is to be done in the site.
- A toolbox meeting is also mandatory because of the hazards that needs to be identified prior the task.
-Everyone involved in the work may also be required to sign the documentations.
-It is also necessary to apply the procedure according to the definition of the tasks.
- There after a summary report be written and summit to site representative.