The thesis or project was presented, and it attracted series of interest and can be useful for research information or academic/professional facts finding and researches. And there are more interesting pages that will be added in due time.
Wednesday, December 14, 2016
MANUFACTURING COST AND ENGINEERING BILL OF ESTIMATE
S.NO DESCRIPTION OF MANUFACTURE UNIT UNIT COST AMOUNT
1 Purchase high speed stainless steel
material to specification in the
BS.Code 18/8 302S25 (Non-magnetic
material) 4 16000 60,000.00
2 Take to workshop,measure dim.as spec
ified in the drawing and cut in power
saw machine. 3 3,300.00 9,900.00
3 Inspection of materials to standard spec.
Bs.Code.18/8 302S25 (note non magnetic matr.l)
ref.Mech.Eng.Data handbookCarvill. 4 10.000.00 30,000.00
4 Carryout keyway operation in milling
Machine. 5 3,500.00 70,000.00
5 Polish surface to dimension as in surface
texture specification 5 3,500.00 18,000.00
6 Mark 25% for Labour cost total. 1 51,000.00 51,000.00
Subscribe to:
Post Comments (Atom)
project supervision of pump installation and design of wellhead pipeline and manifold network, cost evaluation and detail. presentation,,1993.
ReplyDelete