Pages

Wednesday, December 14, 2016

MANUFACTURING COST AND ENGINEERING BILL OF ESTIMATE



        S.NO        DESCRIPTION OF MANUFACTURE   UNIT    UNIT COST   AMOUNT
          1             Purchase high speed stainless steel
                         material to specification in the
                          BS.Code 18/8 302S25 (Non-magnetic
                           material)                                                     4            16000          60,000.00
          2               Take to workshop,measure dim.as spec
                           ified in the drawing and cut in power
                           saw machine.                                              3             3,300.00       9,900.00
          3               Inspection of materials to standard spec.
                         Bs.Code.18/8 302S25 (note non magnetic matr.l)
                                 ref.Mech.Eng.Data handbookCarvill.                            4                  10.000.00         30,000.00
          4                Carryout keyway operation in milling
                          Machine.                                                       5              3,500.00       70,000.00
          5                Polish surface to dimension as in surface
                        texture specification                                        5              3,500.00       18,000.00
          6               Mark 25% for Labour cost total.                     1              51,000.00      51,000.00

1 comment:

  1. project supervision of pump installation and design of wellhead pipeline and manifold network, cost evaluation and detail. presentation,,1993.

    ReplyDelete